Sources and methods
Updated Nov. 11, 2026
Each report is built from the agency, utility or statute pages it cites, read on Nov. 11, 2026, and every money or rule figure carries its effective date.
How a report is put together
A report answers one question. The first sentence gives the answer; the next paragraph gives the facts behind it; the rest is background. Key facts and numbered sources close every report. Numbers are copied from the source page, not rounded into new figures, except where a report says it worked a sum out itself (the two example bills in what 5,000 and 10,000 gallons cost are our arithmetic from SAWS's published 2026 tables).
Where the facts come from
- San Antonio Water System (rates, stages, water quality, rebates, freeze guidance)
- Edwards Aquifer Authority (J-17 readings, Critical Period stages, wells)
- City of San Antonio (stormwater fee, permits, backflow code)
- CPS Energy (gas safety, electric and gas rates)
- TCEQ (septic, backflow testers, irrigators, Edwards rules)
- Texas State Board of Plumbing Examiners (licences)
- Trinity Glen Rose Groundwater Conservation District
- Texas A&M AgriLife Extension and the Texas Well Owner Network
- National Weather Service, San Antonio office (freeze and rain records)
- U.S. EPA, U.S. Department of Energy, ENERGY STAR, CPSC and CDC
- USDA NRCS soil descriptions
No forum posts, contractor blogs, news stories or search snippets are used as the source of a number. Videos come only from official or maker channels.
What couldn't be confirmed
- Bexar County's own septic pages could not be reached when checked Nov. 11, 2026, so county septic fees are not given; the county's role comes from TCEQ's list of permitting authorities.
- The City's online code library could not be reached when checked Nov. 11, 2026, so a few code section numbers are given as SAWS states them.
- Texas's drinking water viewer could not be reached when checked Nov. 11, 2026, so there is no hardness figure by plant; reports use SAWS's stated 15 to 20 grains per gallon.
- Some U.S. Department of Energy pages could not be reached when checked Nov. 11, 2026; where a report cites an archived copy, it says so.
Stage and aquifer figures
The aquifer board and the yard reports state the SAWS stage and the J-17 level as of Nov. 11, 2026. Those readings are provisional when published. They are not live figures; check the SAWS and EAA pages for the current day.