Your billB-07
What 5,000 and 10,000 gallons cost in 2026
Filed Nov. 11, 2026 · checked against 6 sources · Aquifer to Tap
A SAWS bill for 5,000 gallons comes to about $57.32 a month on the 2026 tables, and 10,000 gallons to about $117.31, for an inside-city home with a 5/8-inch meter.
$57.32estimated 2026 bill at 5,000 gal, inside city, 5/8-inch meterSource: SAWS rate tables, our arithmetic

Doubling the gallons slightly more than doubles the bill, because the water, Water Supply Fee and sewer blocks all get more expensive as use climbs. These totals are our arithmetic from the published 2026 tables, not figures checked against SAWS's calculator. They assume Tier 1 stormwater and a sewer winter average equal to the month's use.
How was each line calculated?
Water volume and the Water Supply Fee use the same block limits (4,000, 7,000, 12,000 and 20,000 gallons), with each price applied only to the gallons in its block, per the 2026 residential rates. The Water Supply Fee uses the table SAWS posts, which is headed 2024. The EAA fee and Uplift fee are flat per 1,000 gallons; the TCEQ fee is a flat monthly amount.
| Line | 5,000 gal | 10,000 gal |
|---|---|---|
| Water availability | $9.00 + $2.00 = $11.00 | $9.00 + $2.00 = $11.00 |
| Water volume | 4 × $0.907 + 1 × $1.678 = $5.31 | 4 × $0.907 + 3 × $1.678 + 3 × $3.039 = $17.78 |
| Water Supply Fee | 4 × $1.631 + 1 × $3.018 = $9.54 | 4 × $1.631 + 3 × $3.018 + 3 × $5.464 = $31.97 |
| EAA fee | 5 × $0.3659 = $1.83 | 10 × $0.3659 = $3.66 |
| Uplift fee, water | 5 × $0.102 = $0.51 | 10 × $0.102 = $1.02 |
| TCEQ fee, water | $0.19 | $0.19 |
| Water subtotal | $28.38 | $65.62 |
| Sewer availability | $10.00 | $10.00 |
| Sewer volume | 4 × $2.539 + 1 × $4.444 = $14.60 | 4 × $2.539 + 6 × $4.444 = $36.82 |
| Uplift fee, sewer | 5 × $0.106 = $0.53 | 10 × $0.106 = $1.06 |
| TCEQ fee, wastewater | $0.06 | $0.06 |
| Sewer subtotal | $25.19 | $47.94 |
| Stormwater, Tier 1 (City) | $3.75 | $3.75 |
| Total | $57.32 | $117.31 |
Each line was recomputed from the posted tables for this page and matched; rounding is to the cent at each line (the EAA fee at 5,000 gallons is $1.8295 before rounding).
Where does the extra money go?
The second 5,000 gallons adds about $60. The Water Supply Fee is the biggest piece of that jump, rising from $9.54 to $31.97, because the 7,001 to 12,000 gallon block costs $5.464 per 1,000. At 10,000 gallons it is the largest single volume item on the bill, larger than the water charge itself. The fees are explained in the Water Supply Fee and EAA report.
Sewer grows too, but only if the winter average grows. A summer month of 10,000 gallons with a 5,000-gallon winter average keeps the $25.19 sewer subtotal and comes to about $94.56, by the same method. That gap is why SAWS warns against winter irrigation (the winter average report).
What would change these totals?
Several real-world differences move the figures:
- A new account with no winter record is billed sewer on 5,985 gallons, which puts sewer volume at $18.98 instead of $14.60.
- Tier 2 stormwater ($4.94) or Tier 3 ($10.45) replaces the $3.75 line (the stormwater report).
- Homes outside city limits pay higher availability and volume prices.
- The meter counts in full 100-gallon units, so a month rarely lands on a round number (reading the meter).
Neither example reaches the Stage 3 drought surcharge, which starts above 20,000 gallons. SAWS's own rate calculator now shows the City Council-approved 2027 rates, so it cannot confirm 2026 totals; the 2027 changes are in the 2027 report.
Key facts
- About $57.32 at 5,000 gal and $117.31 at 10,000 gal (2026 rates, inside city, 5/8-inch meter, Tier 1 stormwater)
- Totals are arithmetic from SAWS and City tables, not SAWS calculator output
- Water Supply Fee: $9.54 at 5,000 gal, $31.97 at 10,000 gal
- 10,000 gal in summer with a 5,000-gal winter average: about $94.56
- No drought surcharge below 20,000 gal in Stage 3
Sources
- SAWS — 2026 residential water and sewer tables (checked Nov. 11, 2026)
- SAWS — Water Supply Fee, posted 2024 table (checked Nov. 11, 2026)
- SAWS — EAA permit fee, $0.3659 for 2026 (checked Nov. 11, 2026)
- SAWS — 2026 TCEQ pass-through amounts (checked Nov. 11, 2026)
- City of San Antonio — stormwater fee Tier 1 (checked Nov. 11, 2026)
- SAWS — rate calculator showing 2027 rates (checked Nov. 11, 2026)