Skip to the reports
Aquifer to TapSan Antonio house water, filed in short reports
Beats

Your billB-04

The Water Supply Fee and the EAA fee

Filed Nov. 11, 2026 · checked against 5 sources · Aquifer to Tap

The Water Supply Fee, charged in five blocks from $1.631 to $10.194 per 1,000 gallons, pays for new water sources, while the EAA fee passes through $0.3659 per 1,000 gallons in 2026.

$0.3659EAA pass-through fee per 1,000 gal, 2026Source: SAWS

Wooded hills and a brushy valley over the Edwards Aquifer recharge zone
Wooded limestone hills and a valley of brush and grass in the recharge area. Photo: Chamberlain2007, CC BY-SA 4.0 (credits).

Both fees apply to all potable water, and both sit on the bill as their own lines next to the water volume charge. The Water Supply Fee page says the fee "directly funds the acquisition of new water supplies to reduce San Antonio's dependence on the Edwards Aquifer." The EAA fee recovers the permit fee SAWS pays the Edwards Aquifer Authority, which regulates pumping from the aquifer.

What are the Water Supply Fee blocks?

The residential fee uses the same block limits as the water rate: 4,000, 7,000, 12,000 and 20,000 gallons. The table SAWS posts is headed "2024 Water Supply Fee", and the page text says the rates are effective for consumption on or about Jan. 1, 2023. No 2026-labelled table is posted, so the figures below are the ones SAWS shows as of Nov. 11, 2026.

Residential Water Supply Fee per 1,000 gallons, as posted by SAWS (table headed 2024)
Standard blockRateUplift blockRate
First 4,000 gal$1.631First 2,000 gal$0
4,001 to 7,000$3.0182,001 to 6,000$1.650
7,001 to 12,000$5.4646,001 to 10,000$2.475
12,001 to 20,000$7.17710,001 to 15,000$4.125
Over 20,000$10.194Over 15,000$5.775

Because each block price is higher than the matching water volume price, the fee often costs more than the water itself. At 10,000 gallons no other per-gallon line costs more, as the worked bills show line by line. Uplift households pay their own lower blocks (bill help).

What has the fee paid for?

SAWS names Aquifer Storage and Recovery at H2Oaks, opened in June 2004, as the first major project the fee funded. The site injects surplus Edwards water into the Carrizo Aquifer and pumps it back in dry months; in 2025 SAWS recovered more than 27,000 acre-feet from it.

The shift away from one source is large. In 1995 all SAWS water came from the Edwards; the system now draws on seven sources through 13 supply projects, and about 47 percent of the water customers used in 2025 came from the Edwards, per its supply overview. The full source list covers the rest.

The EAA permit fee

SAWS passes the fee through to every water customer at $0.3659 per 1,000 gallons for 2026, under Ordinance No. 87042. It is a single flat rate with no blocks, so 10,000 gallons carries ten times the charge of 1,000. The EAA's own per-acre-foot charge to permit holders could not be confirmed; its fee page returned an error when checked.

The EAA also runs its own drought plan for permit holders. As of Nov. 11, 2026, it has the San Antonio Pool in EAA Stage 2, a 30 percent pumping cut effective Nov. 3, 2026, while SAWS customers remain in SAWS Stage 3. See how the two stage systems differ.

Next to watch SAWS's approved 2027 rate pages did not list a 2027 Water Supply Fee or EAA fee when checked Nov. 11, 2026; see the 2027 report.

Key facts

  • Water Supply Fee blocks: $1.631, $3.018, $5.464, $7.177, $10.194 per 1,000 gal
  • SAWS's posted Water Supply Fee table is headed 2024; no 2026 table is posted
  • EAA pass-through fee: $0.3659 per 1,000 gal in 2026, flat
  • Aquifer Storage and Recovery at H2Oaks was the first major project the Water Supply Fee funded
  • About 47 percent of 2025 SAWS customer use came from the Edwards

Sources

  1. SAWS — Water Supply Fee (checked Nov. 11, 2026)
  2. SAWS — EAA permit fee pass-through (checked Nov. 11, 2026)
  3. SAWS — Aquifer Storage & Recovery (checked Nov. 11, 2026)
  4. SAWS — Edwards share of 2025 supply (checked Nov. 11, 2026)
  5. EAA — San Antonio Pool stage panel (checked Nov. 11, 2026)