Skip to the reports
Aquifer to TapSan Antonio house water, filed in short reports
Beats

Your waterW-10

Private wells in Bexar County: who is in charge

Filed Nov. 11, 2026 · checked against 5 sources · Aquifer to Tap

Private wells in Bexar County that pump from the Edwards Aquifer must, under state law, be registered with the Edwards Aquifer Authority, whose jurisdiction covers all of Bexar County.

25,000 gal/daymost an EAA exempt domestic or livestock well may be able to produceSource: Edwards Aquifer Authority

A private well head, pressure switch and blue pressure tank inside a small pump shed
Steel well casing cap, pressure switch and blue pressure tank inside a wooden pump shed with gravel floor. AI-generated picture.

The EAA's registration page says "State law requires all wells that withdraw water from the Edwards Aquifer to be registered with the EAA." Wells in the Trinity Aquifer under northern Bexar County fall under a separate body, the Trinity Glen Rose Groundwater Conservation District. Drilling and pump installation anywhere in Texas take a state license from the Texas Department of Licensing and Regulation (TDLR).

Which category is a household well in?

The EAA category written for household wells is the "exempt well." To qualify, a well must be registered, be incapable of producing more than 25,000 gallons a day, be used only for domestic or livestock purposes, and not serve a subdivision that requires platting, which the EAA defines as supplying more than three homes in a recorded development. An exempt well needs no withdrawal permit.

A second group, "limited production wells," covers wells drilled before June 1, 2013. They may pump up to 1.4 acre-feet a year without a withdrawal permit, but owners must register them, fit a registered meter, file yearly use reports and pay a $25 yearly administration fee. The page gives no separate effective date for that fee; it was last modified April 5, 2025.

Who handles what for a Bexar County private well (checked Nov. 11, 2026)
AgencyCoversExample rule or fee
Edwards Aquifer Authoritywells into or through the Edwardsregistration required; $25 per construction permit application
Trinity Glen Rose GCDTrinity Aquifer under northern Bexar Countyapproval before drilling, modifying or plugging; no fee to register an existing well
TDLRdrillers and pump installers statewidelicense required to drill or install a pump

Drilling, modifying, buying a property with a well

A new well into or through the Edwards needs an EAA permit first; each construction application and each drill-through application costs $25, per the EAA's well construction page. In the Trinity district, an application goes to the district before anyone drills, modifies or plugs a well, according to its drilling page. The district also requires a geophysical log on every well permitted on or after Dec. 1, 2004.

TDLR states that "A license is required to drill a water-related well in Texas and to install a pump for a water-related well." Pump and drilling work belongs to those licensees.

New owners of a registered Edwards well update the record with an EAA owner update form at no cost. The Trinity district charges nothing to register an existing well or transfer ownership, per its rules page; its current rules were adopted Oct. 16, 2025, and proposed changes go to a public hearing on Dec. 17, 2026.

Drought rules and wells

EAA drought cutbacks bind withdrawal-permit holders above three acre-feet yearly rather than the general public, and the EAA does not enforce lawn watering. Exempt domestic wells fall outside those cuts. The Trinity district listed itself in its own Drought Stage 2 as of Nov. 11, 2026. How the EAA stage differs from SAWS's is explained in the two-stage comparison.

Owners on a well are responsible for their own water quality; testing a private well sets out the schedule, and abandoned wells covers plugging. Rural lots with a well may also be on septic, the subject of septic in Bexar County.

Next to watch As published on Nov. 11, 2026, the Trinity Glen Rose GCD had a public hearing on proposed rules set for Dec. 17, 2026; the district's site has the outcome.

Key facts

  • All Edwards wells must register with the EAA (state law)
  • EAA exempt well: registered, no more than 25,000 gal a day, domestic or livestock only
  • EAA construction permit application: $25
  • Trinity Glen Rose GCD governs the Trinity under northern Bexar County
  • TDLR licenses well drillers and pump installers

Sources

  1. Edwards Aquifer Authority — Well Registration and Updates (checked Nov. 11, 2026)
  2. EAA — well construction and closure rules (checked Nov. 11, 2026)
  3. EAA — Critical Period/Drought Management (checked Nov. 11, 2026)
  4. Trinity Glen Rose GCD — Water Well Drilling and Rules, Forms and Fees (checked Nov. 11, 2026)
  5. TDLR — Water Well Drillers and Pump Installers (checked Nov. 11, 2026)